Useful Tools
Screening tools for human health risk assessment
FPS e-pile load schedule
Some of the biggest potential sources of delay and non-conformance with pile construction are untimely and ambiguous pile design information. Click here for a simple Excel based spreadsheet to assist both engineers and piling contractors with the provision of pile design schedules.
E-Tendering Protocol
The AGS, in conjunction with the FPS, have produced a protocol to be used when tendering electronically for geotechnical works.
|